SUAL SEAPORT DEVELOPMENT u Location : Sual, Pangasinan
u Project Description : The project involves the development of seaport in Sual to directly serve the existing coal-fired power plant, needs of industries locating in the proposed industrial estate and the needs of other industrial/commercial activities existing in the province. Major activities include: Ø dredging of harbor basin Ø provision of 5,700 meters berth length Ø reclamation of at least 432 hectares back-up area u Status : l A preliminary survey conducted by the Philippine Ports Authority found out that Cabalitian Bay is suitable for the development of port due to its following features: Ø Cabalitian Bay is deep, with a minimum of 15 to 18 meters Ø Its harbor basin provides a turning radius of 1,200 meters Ø Back-up area could easily be made available l With Sangguniang Bayan / Provincial Development Council / Regional Development Council Resolutions of Endorsement l With Presidential Executive Order (EO284) Declaring and Delineating the Sual Port Zone under the Administrative Jurisdiction of the Philippine Ports Authority l For Feasibility Study Preparation u Cost Estimate : To be determined by the feasibility study t Mode of Financing : For Private Sector Investment SUAL SEAPORT DEVELOPMENT u Site Accessibility :
u Services/Utilities Available:
Ø Telegraph - 1 telegraph station Ø Telephone - Digitel, Smart, Globe cover Sual l Postal Communication - 1 post office l Road Network - Existing Barangay/Provincial roads around the bay area are connected to the national highway l Water - Deepwells, shallow wells l Health - 1 Municipal Health Center and 6 Barangay Health Stations |